MACHS Stadium

Roof cover by ETFE cushions for MACHS

Area1,500 m²
FabricETFE
CityDammam
Year2023
SectorSports

Project overview

The MACHS Stadium is the sports stadium of Mohammed Al-Mana College for Health Sciences (MACHS) in Dammam. Its long-span arched roof is built from double-layer ETFE cushions covering more than 1,500 m². TMSI's scope was design, supply and installation, and the project is dated 2023.

The cushions are held permanently at 250–300 Pa by an air handling unit with two fans for load sharing and redundancy; non-return valves hold pressure in the system. The trapped air gives the roof its stiffness and an insulating cavity, with a U-value of approximately 2.9 W/m²K for the two-layer build-up. The cushion grid was laid out so that no rectangular cushion exceeds the 3.5 m guideline span, and individual cushions can be replaced without disturbing the rest of the roof.

The primary structure is a grid of rolled tubular steel arches, fabricated, trial-assembled and coated in the TMSI factory for the coastal Eastern Province environment, then pre-assembled at ground level and lifted into place. Each ETFE cushion was test-inflated and inspected in the factory before dispatch.

PROJECT 03

ETFE Double Layer Cushion System · Dammam, Saudi Arabia

Project data

Project data
ProjectMACHS — Mohammed Al-Mana College for Health Sciences
LocationDammam, Saudi Arabia
SystemETFE double layer cushions
Approx. area1,500+ m2
Cushion pressure250 – 300 Pa
InflationAir handling unit, dual fan
StructureRolled tubular steel arch grid
ScopeDesign, supply and install

Scope of works

  • Structural design of the long-span arched roof and cushion layout
  • Factory rolling, welding and pre-assembly of the tubular steel arch grid
  • Fabrication of double-layer ETFE cushions with welded perimeter keder
  • Installation of aluminium extrusion, cushions and air distribution pipework
  • Inflation plant installation, pressure commissioning and handover

System description

  1. 01Double-layer ETFE cushion system providing a U-value of approximately 2.9 W/m2K.
  2. 02Cushions permanently inflated to 250–300 Pa, giving structural stiffness and an insulating air cavity.
  3. 03Air handling unit with dual fans for load sharing and redundancy, plus non-return valves to hold pressure.
  4. 04Fully integrated aluminium perimeter extrusion with air inlet and integral water seal.
  5. 05Rolled tubular steel arch grid fabricated in the TMSI factory and pre-assembled before lifting; individual cushions can be replaced without disturbing the remainder of the roof.

MACHS — Fabrication & Installation

Every panel is engineered, patterned and welded in our Dammam factory, then delivered to site as a finished, numbered assembly. The sequence below follows the actual production and installation route used on this project.

  1. 01 Form Finding & Cushion LayoutArch geometry and cushion grid are developed together so no rectangular cushion exceeds the 3.5 m guideline span, analysed for Dammam wind and thermal load.
  2. 02 Pipe Rolling & Steel FabricationTubular sections are rolled to radius, cut and welded into arch segments, then verified against the setting-out template.
  3. 03 Arch Assembly & CoatingSegments are trial-assembled on a jig to prove the full profile, then blast-cleaned and coated for the coastal Eastern Province environment.
  4. 04 Pre-Assembly on SiteArches are re-assembled at ground level adjacent to the building, complete with lifting points and rigging, ready for a single lift.
  5. 05 Lifting & ErectionComplete arches are craned into position, aligned and bolted down, with temporary bracing retained until the grid is closed.
  6. 06 Secondary Steel & SurveySecondary members are installed and the grid surveyed so the extrusion line matches the fabricated cushion dimensions exactly.
  7. 07 Extrusion & Air InletsThe perimeter extrusion is installed with clamping profiles, gaskets, air inlet spigots and the integral gutter and water seal.
  8. 08 Cushion FabricationUpper and lower foils are patterned and thermally welded with a keder edge. Each cushion is test-inflated and inspected in the factory before dispatch.
  9. 09 Cushion InstallationCushions are lifted, the keder is fed into the extrusion on all sides and clamping plates are torqued to the specified sequence and value.
  10. 10 Inflation & CommissioningAir pipework is run to every cushion from the dual-fan air handling unit. Pressure is balanced, alarms proven, and the system handed over with as-built records.

DESIGN & ENGINEERING

MACHS – Design & Engineering

Brief Description — Structural Concept & Roof Geometry

For the ETFE structures, this pre calculation report has been prepared. The aim of the pre calculation report is to check the conceptional design of structure and load conditions.

Analysis model of the barrel-vaulted cushion roof, the arch grid shown with its supports along both long edges.
Structural concept and roof geometry

Structural Drawings — Plan & Elevation

Structural plan of the roof grid above, and the longitudinal elevation of the arches below.
Plan and elevation

Loadings — Dead, Collateral & Live Load

The dead load of the structural elements have been taken into calculation by the software. The collateral load is taken into calculation as 0.4 kN/m² × 4.5 m = 1.8 kN/m.

The live load is taken into calculation as 0.24 kN/m² as per ASCE 7-16.

Analysis model with the dead load case LC2 applied along the arches, load arrows in kN/m.
LC2 : D — dead load [kN/m]
Analysis model with the live load case LC3 applied over the roof surface, load arrows in kN/m².
LC3 : L — live load [kN/m²]

Wind Loading — Velocity Pressure (ASCE 7-16 / SBC 301)

The wind load is taken into calculation as 152 km/h as per SBC 301.

Analysis model with the closed cushion wind load case LC5 applied to the roof, pressure arrows in kN/m².
LC5 : Closed Cushion — Wind [kN/m²]
Structure type
Arched Roofs
Velocity
42 m/s  ·  94 mph  ·  152 km/h
Ground elevation
0.00 m
Mean height
13.30 m  ·  43.64 feet
Velocity pressure exposure coefficient Kz
0.78
Topographic factor Kzt
1.00
Wind directionality factor Kd
0.85
Ground elevation factor Ke
1.00
Velocity pressure qh
0.72 kN/m²  ·  15.1 psf
Net design wind pressure P
0.61 kN/m²  ·  12.8 psf

qz = 0.613 KzKztKdKeV² (N/m²); V in m/s  (26.10-1.si)  ·  P = qz · G

ASCE 7-16: Minimum Design Loads and Associated Criteria for Buildings and Other Structures.

Sliding Support — Maximum Displacements & Detail

Plan of the roof with the sliding supports marked along one edge, and below it the dimensioned detail B of the sliding support plate at 1:10.
Sliding supports and Detail B, 1:10

Steel System Analysis — Zone A Design Ratios

Design ratio plot of the steel arches, each member labelled with its ultimate and serviceability limit state ratio.
RF-STEEL AISC CA1 — ultimate limit state and serviceability limit state, max design ratio

Cable Design — Internal Forces

Member internal force diagram of the cables with the peak values labelled along each cable line.
Members internal forces N — max N 376.03 kN, min N 33.62 kN

Cable Design Calculation — Member Sizing

Definitions, symbols and values — 28 rows
Definitions, symbols and values
DefinitionsSymbolUnitValueFormulation
Cable tensionNges[kN]376.00
Quantity of cablesn[-]1
Cable tension in the single cableNseil[kN]376.00
Design CriteriaLRFD
Load Safety Factorγf[-]1.00
Material Safety FactorγR[-]1.00(usually 1.0)
Cable Type1X37
Cable Diameterd[mm]36
Tensile StrengthRr[N/mm²]1770
Youngs Modulus for variable actionEQ[kN/cm²]15000
Filling load factorf[-]0.750
Equavalent Diameter Factorfed[-]0.866
Equavalent Diameter (Sap2000)de[mm]31.18=de*fed
Reduction dirillingk[-]0.883
Self Weight factorw[kg/cm²]0.830
Breaking Load FactorK[-]0.520= π*f*k/4
Metallic Cross Sectional AreaAm[cm²]7.634
Nominal Metallic Areac FactorC[-]0.590
Stifness Single CableEA[MN]114.511
Stifness All cablesEAges[MN]114.511
Cable Weightg[kg/m]6.34=Am*w
Minimum Breaking Load CableFmin[kN]894.6= K*d2*Rr/1000
Socet TypeSwaged Socket
Loss factor (Due to cable fitting)ke[-]0.90
Characteristic value of the resistanceFuk[kN]805.2=Fmin*ke
Design Value of the cable tensionFEd[kN]376.00=Nseil*γf
Design value of the cable resistanceFrd[kN]536.78=Fuk/1.5*γR
Verification in the ultimate limit stateFed/Frd[-]0.70OK

Cable Design — Reference Tables (Unit Weight & Breaking Force)

Reference tables for spiral strand rope: fill factor, breaking force factor and metallic area factor, and modulus of elasticity, with the values used marked in red.
Fill factor, breaking force factor and metallic area factor, and modulus of elasticity for variable loads

ETFE Foil Design — Warp & Weft Direction Forces

Membrane force plot of the cushions in the warp direction with the colour scale in kN/m.
Warp direction — max n-x 7.09 kN/m
Membrane force plot of the cushions in the weft direction with the colour scale in kN/m.
Weft direction — max n-y 7.14 kN/m

Connection Design — Pinned Support

Steel
S235
Concrete
4000 psi, C30
Analysis
Stress, strain / simplified loading
Design code
AISC — LRFD 2016
Members — geometry — 1 row
Members — geometry
NameCross-sectionβ – Direction [°]γ - Pitch [°]α - Rotation [°]Offset ex [mm]Offset ey [mm]Offset ez [mm]Forces in
M11 - CHS323.9/10.00,0-90,00,0000Node

Connection Design — Bolts Verification

Bolts — 8 rows
Bolts
ItemGradeLoadsF t [kN]V [kN]φR n,bearing [kN]Ut t [%]Ut s [%]Ut ts [%]Status
B1M24 8.8 - 1LE722,846,8311,011,238,4-OK
B2M24 8.8 - 1LE840,346,5311,019,838,1-OK
B3M24 8.8 - 1LE820,047,0311,09,838,6-OK
B4M24 8.8 - 1LE80,247,3311,00,138,8-OK
B5M24 8.8 - 1LE80,647,7311,00,339,0-OK
B6M24 8.8 - 1LE80,247,7311,00,139,1-OK
B7M24 8.8 - 1LE110,050,0311,00,041,0-OK
B8M24 8.8 - 1LE1123,749,9311,011,640,9-OK
Design data — 1 row
Design data
GradeφR n,tension [kN]φR n,shear [kN]
M24 8.8 - 1203,4122,0

Connection Design — Weld Verification

Welds — 32 rows
Welds
ItemEdgeXuT h [mm]L s [mm]L [mm]L c [mm]LoadsF n [kN]φR n [kN]Ut [%]Status
PP1aRIB1aE70xx4,05,7749LE85,711,649,2OK
E70xx4,05,7749LE116,411,555,2OK
B1-arc 5RIB1aE70xx4,05,715510LE114,09,243,6OK
E70xx4,05,715510LE84,39,147,0OK
PP1aRIB1bE70xx4,05,7749LE106,211,753,1OK
E70xx4,05,7749LE106,511,357,6OK
B1-arc 13RIB1bE70xx4,05,715510LE104,49,347,3OK
E70xx4,05,715510LE104,79,251,0OK
PP1aRIB1cE70xx4,05,7749LE16,511,556,7OK
E70xx4,05,7749LE16,211,852,3OK
B1-arc 21RIB1cE70xx4,05,715510LE14,49,446,7OK
E70xx4,05,715510LE14,89,251,8OK
PP1aRIB1dE70xx4,05,7749LE125,711,549,3OK
E70xx4,05,7749LE44,210,939,0OK
B1-arc 29RIB1dE70xx4,05,715510LE123,49,336,2OK
E70xx4,05,715510LE123,99,142,8OK
PP1aRIB1eE70xx4,05,7749LE124,710,644,1OK
E70xx4,05,7759LE85,212,143,0OK
B1-arc 37RIB1eE70xx4,05,715510LE84,29,345,6OK
E70xx4,05,715510LE114,79,151,9OK
PP1aRIB1fE70xx4,05,77511LE107,513,655,5OK
E70xx4,05,77511LE107,513,555,4OK
B1-arc 44RIB1fE70xx4,05,715510LE105,69,559,1OK
E70xx4,05,715510LE105,09,950,4OK
PP1aRIB1gE70xx4,05,77511LE17,613,556,5OK
E70xx4,05,77511LE17,713,656,7OK
B1-arc 53RIB1gE70xx4,05,715510LE15,09,950,6OK
E70xx4,05,715510LE15,69,559,3OK
PP1aRIB1hE70xx4,05,77411LE84,513,533,6OK
E70xx4,05,77411LE116,313,446,8OK
B1-arc 60RIB1hE70xx4,05,715510LE124,49,148,3OK
E70xx4,05,715510LE123,69,538,3OK

Connection Design — Strain & Equivalent Stress Check

Strain check and equivalent stress plot of the pinned connection under load effect LE1, with the 150 % limit gauge and the 0 to 211.5 MPa colour scale.
Strain check, LE1 — 0.48 % · Equivalent stress, LE1